Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13658570

- Product Categories
- Friendly Links
Information Name: | Supply of textile waste heat recovery boiler |
Published: | 2015-07-09 |
Validity: | 30 |
Specifications: | DZL |
Quantity: | 20.00 |
Price Description: | |
Detailed Product Description: | Textile waste heat recovery boiler Description: It is estimated that: a scale of processing 50 million meters of printing and dyeing enterprises coal consumption of up to 3.5 million tons / year. Equivalent steam consumption is about 280,000 tons, due to the market demand for coal increased year by year, the market price of steam coal and mid-rise and high, a direct result of the cost of printing and dyeing industry meter increases. Profitability fell straight printing and dyeing enterprises, many companies are on the maintenance of the present level of security. Mill boiler flue gas temperature at temperatures up to 300 degrees, how this part of the high temperature flue gas recycle it? Installation mill boiler flue gas heat recovery device can recover this part of the flue gas to produce hot water or steam, usually 3-8 months will be able to recover all the equipment investment. Because the device is recovered smoke, exhaust heat, so no other energy sources, saving energy and protecting the environment, energy saving quality products. This product uses superconducting heat pipe is a heat transfer material, superconducting heat pipe is relying on its internal working fluid in a vacuum evacuated to a certain closed housing cycle phase change heat transfer device, its working principle is: When the heat from the high temperature heat incoming heat pipe, in the working fluid of the heat pipe is heated within the segment was immediately activated, heat vaporized into steam (vaporized), the steam instantaneous flow of the heat pipe and the other end (transmission section) and arriving cold release latent heat at the other end after coagulation a liquid (condensation), the condensed liquid through the transmission section back to the vaporization section, cycle phase change heat transfer is achieved. Super thermal conductivity of superconducting heat pipe is generally about metals times, heat transfer efficiency up to 98%, which is any conventional heat exchanger can not be achieved. I can see by the heat exchanger material mills boiler flue gas heat recovery equipment heat transfer efficiency is very high, usually in 3-8 months to recover all the investment, useful life of equipment in more than eight years, this kind of equipment to the enterprise economic efficiency is very impressive. |
Admin>>>
You are the 21643 visitor
Copyright © GuangDong ICP No. 10089450, Shanghai Nanyang heat pipe Boiler Manufacturing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21643 visitor
Copyright © GuangDong ICP No. 10089450, Shanghai Nanyang heat pipe Boiler Manufacturing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility